During the survey period, these sampled mills produced 2.14 million tonnes/day of hot metal on average, also up 7,300 t/d on week, and their blast furnace operational rate also increased by 1.09 percentage points on week to 72.7% as of Thursday.
"Recently, the recovered downstream steel demand and strengthened steel prices
............
To read the full article take a free 7-day trial to Mysteel Global
FREE TRIALAlready registered?Log in
- +65 6653 8227 globalsales@mysteel.com