| Product | Region | Specs. (mm) | Material | FOB(USD/t) | Change |
|---|---|---|---|---|---|
| High-speed wire rod | Istanbul | Φ5.5-10 | SAE1006 | ||
| High-speed wire rod | Istanbul | Φ5.5-10 | SAE1008 | ||
| Rebar | Istanbul | Φ8 | B500B | ||
| Rebar | Istanbul | Φ10 | B500B | ||
| Rebar | Istanbul | Φ12-32 | B500B | ||
| Bar-in-coil | Istanbul | Φ8-10 | B500B |
Note:
1. Priced in $/t.
2. VAT not included, invoiced on actual weight.
3. Rebars are cut to length of 12 meters. The minimum order size is 100 tonnes.
4. Price Terms: FOB Turkish main ports (FOB StL/S/D).
5. To be delivered within 4-8 weeks.
6. Payment terms: L/C at sight
7. The price changes are calculated against the last updates of the previous day.
8. Prices are updated on a daily basis on China’s working days, and will cease to update during official holidays.