Zhenhua Oil Qingdao Dongjiakou Crude Oil Reservoir Area Project, constructed by Shandong Harbor Construction Group Qingdao Port Engineering, successfully passed the completion acceptance one month ahead of schedule on May 22, according to OilChem's information from the market.
This project, as the first tank farm project put into operation in Shandong Port this year, has a total investment of 800 million yuan, with a designed storage capacity of 80×104m3. It has now completed the construction of eight 0.1 million cubic meters external floating roof crude oil storage tanks and related supporting facilities, such as process pump sheds and fire water tanks, bringing an additional crude oil storage capacity of 0.8 million cubic meters, with designed turnover capacity of 6 million tonnes/year, data from public information showed.
Once completed, the project will mainly receive crude oil from existing jetties of Dongjiakou port, which is of great significance for ensuring the supply of crude oil to petrochemical enterprises in the hinterland and improving the strategic positioning of oil production in Qingdao Port.
Written by Catherine Sun, sss@oilchem.net
Edited by Navy Liu, navy@oilchem.net