Recently, Xinje Energy Technology (Zhejiang) Co., Ltd. Zhejiang Inx Technology Co., Ltd. announced in the Xiaoshan Economic Development Zone that the first batch of solid-state cylindrical batteries with fully independent intellectual property rights has successfully rolled off the production line, and its 2 GWh lithium metal solid-state battery project has commenced full-scale production.
In 2023, Xinje Energy completed the construction of the nation's first 200 MWh lithium metal solid-state battery production line. In 2024, the company initiated the construction of the world's first mass production line in Changzhou City, with a capacity of 5 GWh (to be implemented in phases). The project in Xiaoshan, mentioned above, has a total planned capacity of 10 GWh. The first phase, which has just commenced production, has a planned capacity of 2 GWh and represents a total investment of Yuan 1 billion, establishing it as Xinje Energy's first large-scale production base.
Edited by Cassie Li, lixiangying@mysteel.com